TITLE: 09/15 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: PSL work and other vent prep work going on.
LOG:
- 15:40 Elizabeth to LVEA
- 15:45 Christina, Karen, Vanessa to LVEA
- 15:49 Jason, Ed to PSL enclosure
- 15:58 Ken done at MX
- 16:10 Hanford Fire Dept on site for testing
- 16:44 Jeff B out of PSL
- 16:46 Ken opening up OSB roll up doors to LVEA
- 17:09 Hugh to CER to work on CPS noise level
- 19:53 Bubba and visitor to EX
- 20:22 Jason, Ed to PSL
- 20:58 Marc to LVEA to test cables
- 22:16 Peter to PSL