Reports until 15:57, Monday 18 September 2017
H1 General
edmond.merilh@LIGO.ORG - posted 15:57, Monday 18 September 2017 (38678)
Shift Summary -Day

TITLE: 09/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: N/A
SHIFT SUMMARY:

Venting of HAMs 1 and 6 is underway today
LOG:

15:35 Richard going to inspect HVAC in LVEA

16:14 Jason going into PSL enclosure

16:17 Gerardo out to HAM1&6 to climb up and close ion pump gate valves in preperation for venting.

16:20 Richard and Peter out near PSL investigating remote DBB issue

16:34 Richard and Peter back

17:06 Jason heading back out to PSL enclosure to test AC.

17:14 Richard heading down arms to check fire panels

17:24 Jason called to say that AC in the PSL is still not functioning properly

17:25 Betsy and Travis back

17:26 Hugh out to EY

17:49 Richard back. He had to reset EX fire panel.

18:03 Hugh back

18:07 Jeff B into LVEA to check dust monitors

18:17 Hugh to EX to let HFD in to veriy fire panel.

18:28 Jeff B out

18:31 Richard out to LVEA to reset PSL AC breakers

18:53 Dave B out to EX

20:00 Jason out to PSL enclosure

20:10 Dust monitor 10 300u RED alarm

20:16 Dave B out to both mid stations

20:45 Dave B back

21:10 Travis out to LVEA to drop off a floodlight

22:13 Dave B back. Said the door at MX between the mech room and the VEA was "propped" open?