TITLE: 09/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: N/A
CURRENT ENVIRONMENT:
Wind: 20mph Gusts, 17mph 5min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.38 μm/s
QUICK SUMMARY:
Maintenance
Vent: East door removed from HAM2