Reports until 16:01, Tuesday 19 September 2017
H1 General
edmond.merilh@LIGO.ORG - posted 16:01, Tuesday 19 September 2017 (38702)
Shift Summary - Day

TITLE: 09/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
LOG:

15:50 TVo and TJ to LVEA  to look for cards

15:51 Richard to CER to look at power supplies

16:01 T&T out

16:10 TJ, TVo and PK to ends for HWS work

16:28 Jim back from EY

16:37 Betsy out to the floor

16:40 Corey out to squeezer bay

16:42 Dave B to reboot EY computers.

16:48 Travis heading into LVEA

16:56 Richard out of CER

18:12 Dave back from EY

18:25 Dave has restarted all FE at EY.

18:33 Jim recovering SEI at EY

18:45 Jeff B out to floor

18:46 TJ. TVo and Peter back from Ends

20:50 Jason back into the PSL

21:10 Peter and Jason back into the PSL

21:13 Dave B brought to my attention that the EY SWWD was still tripped. Untripped.

21:18 Corey back into the squeezer bay

21:53 Rick and Kantoro out to look at HAM2