TITLE: 09/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
LOG:
15:50 TVo and TJ to LVEA to look for cards
15:51 Richard to CER to look at power supplies
16:01 T&T out
16:10 TJ, TVo and PK to ends for HWS work
16:28 Jim back from EY
16:37 Betsy out to the floor
16:40 Corey out to squeezer bay
16:42 Dave B to reboot EY computers.
16:48 Travis heading into LVEA
16:56 Richard out of CER
18:12 Dave back from EY
18:25 Dave has restarted all FE at EY.
18:33 Jim recovering SEI at EY
18:45 Jeff B out to floor
18:46 TJ. TVo and Peter back from Ends
20:50 Jason back into the PSL
21:10 Peter and Jason back into the PSL
21:13 Dave B brought to my attention that the EY SWWD was still tripped. Untripped.
21:18 Corey back into the squeezer bay
21:53 Rick and Kantoro out to look at HAM2