david.barker@LIGO.ORG - posted 11:32, Tuesday 19 September 2017 (38704)
h1brsey computer power cycled
Jim and Dave:
as part of EY BRS code issues, I power cycled the h1brsey computer. This was a full power down, using the rocker switch on the rear of the unit after the windows operating system had shut the machine down.