TITLE: 09/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: Appears that Bubba and crew are in bier garten and Jeff B. is in LVEA. Peter is in the PSL enclosure. 15:21 UTC Hugh to LVEA to survey HEPI 15:30 UTC Filiberto moving SUS chassis from rack on high bay side of HAM6 to rack on other side and rerouting cables with them. 15:36 UTC Richard to LVEA to work with Filiberto. 15:41 UTC Rick to LVEA to work with Hugh 16:04 UTC Travis to LVEA to take cameras off HAM3 16:28 UTC Travis back 16:47 UTC Richard back. Filiberto dressing tip tilt cables. Rick in HAM2 removing ISS array 17:39 UTC Betsy and Travis to inspect BSC3 17:41 UTC Door being craned (on camera) 17:46 UTC Richard to LVEA to see Fil 17:55 UTC Karen to end Y 17:56 UTC Jeff and Sheila to HAM2 to install last of ISI damper mechanisms 18:10 UTC Gerardo to end Y to pick up TMDS part 18:31 UTC Karen leaving end Y, going to mid Y 18:47 UTC Corey to LVEA to distribute clean tools 18:57 UTC Karen leaving mid Y, going to end X 19:03 UTC Corey back One door off of HAM3 19:33 UTC Karen leaving end X 21:04 UTC Corey to squeezer bay 21:44 UTC Rick taking visitors through LVEA 22:00 UTC Site weekly meeting