TITLE: 09/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 14:31 UTC Peter to PSL enclosure 14:45 UTC Jeff B. to HAM3 to pull witness plates 15:15 - 15:47 UTC Morning meeting 15:50 UTC Jeff K. to optics lab to finish tuning TMDs for HAM2 15:53 UTC Peter back 16:12 UTC Travis to HAM3 to pull witness plates, lock SUS 16:21 UTC Rick taking visitors into PSL enclosure 16:37 UTC Betsy to HAM3, bier garten area, in and out of chambers there 16:41 UTC Hugh to HAM2 to continue ISI damper install work 17:05 - ~17:13 UTC Amber leading tour in control room 17:28 UTC Jeff K. done tuning TMDs and about to begin ITMX violin mode measuring with Travis 18:20 UTC Vern taking visitor on tour of LVEA 18:37 UTC Rick and visitors done in PSL enclosure 18:44 UTC Dave to CER to look at ASC equipment 19:11 UTC Karen to end Y 19:23 UTC Amber leading tour in control room 19:25 UTC Betsy, Travis and Jeff K. back for lunch 19:33 UTC Karen leaving end Y, going to warehouse 19:37 UTC Take cover *drill* phone message from Hanford DOE (300, 400 areas) 19:50 UTC Jim, Hugh, Robert and Corey to HAM3. Pull baffle and ISI damper work. 19:58 UTC Take cover *drill* terminated phone message from Hanford DOE 20:18 UTC Jeff K. and Travis back to ITMX to measure in air violin modes 20:57 UTC Marc to mid Y 21:01 UTC Rick, Kentaro and Jian to HAM2 area, possibly work on ISS array 21:10 UTC Chandra taking two visitors into LVEA 22:18 UTC BS SUS WD tripped 22:20 UTC Reset BS SUS WD 22:42 UTC Robert back, baffle removed from HAM3