Any details from teams may be in other alogs, but in summary today the following happened.
HAM2 (Kissel, Hugh, Jim, Rick, various helpers):
HAM2 ISI damper installs were finished
ISS was reseated in it's previous position after moved for access for the IS damper install
HAM3 (Corey, Robert, Hugh, Jim, Bartlett, Travis):
Finished HAM3 chamber entry contam control - pulled wafers, samples, etc.
Locked up MC2 and PR2 optics, added face shields
Inner panels of Swiss Cheese Baffle (MCA1, I think) were removed via Corey and Robert walking down the MC tube from HAM3 with tools
H3 ISI damper work started
Robert took a photo assay of HAM and BSC optic views via a walkabout in the corner chambers
BSC3 (Kissel, Travis, Betsy):
Removed the hefty QUAD structure sleeve
Mounted equipment to measure violin modes of the ITMx fibers
Took 1 fiber-worth of violin measurements (the fundamental and then 3 harmonics above that - up to 2k)