TITLE: 09/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 14:51 UTC Karen to LVEA 15:40 UTC Corey to LVEA to move the baffle removed from HAM3 15:44 UTC Gerardo to LVEA to turn on purge air connection at HAM3 15:51 UTC Corey back 16:00 UTC Gerardo back 16:37 UTC Hugh to HAM3 to work on ISI damping with Jim 16:50 UTC Jeff B. to LVEA to survey supplies 17:32 UTC Betsy to LVEA looking for parts 17:48 UTC Dave to CER, WP 7162 18:23 UTC Betsy back 18:34 UTC Untripped HAM4,5 ISI WDs 18:34 UTC Dave back 19:10 UTC Robert to BSC chambers for visual inspection 19:20 UTC Dave powering up ASC 19:38 UTC DAQ restarted 20:00 UTC SUS BS WD tripped. Reset. 20:08 UTC Travis to BSC area to drop off equipment. 20:12 UTC Jeff K., Hugh, Jim to HAM3 for B&K measurments. Jeff K. then to BSC for violin mode measurements. Peter to PSL enclosure 20:39 UTC Jason to optics lab to retrieve parts 20:45 UTC Robert back 20:52 UTC HAM5 ISI WD tripped. Reset. Tripped again. Left tripped. 21:29 UTC Peter back 21:47 UTC Travis to bier garten to help with violin mode measurements Delivery from RDL for Gerardo through gate. Kyle received. 22:07 UTC Cheryl to optics lab Jeff and Jim back, Robert to BSC chambers 23:27 UTC Reset ITMX SUS WD and rerequested ALIGNED. Reset HAM5 ISI WD.
Robert reports that he wiped the floor of the BSC2 chamber when he went in there. Subsequently, we have been wiping BSC 1-3 floors as we go in ~each time since.