Ops Shift Summary
TITLE: 09/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

14:51 UTC Karen to LVEA
15:40 UTC Corey to LVEA to move the baffle removed from HAM3
15:44 UTC Gerardo to LVEA to turn on purge air connection at HAM3
15:51 UTC Corey back
16:00 UTC Gerardo back
16:37 UTC Hugh to HAM3 to work on ISI damping with Jim
16:50 UTC Jeff B. to LVEA to survey supplies
17:32 UTC Betsy to LVEA looking for parts
17:48 UTC Dave to CER, WP 7162
18:23 UTC Betsy back
18:34 UTC Untripped HAM4,5 ISI WDs
18:34 UTC Dave back
19:10 UTC Robert to BSC chambers for visual inspection
19:20 UTC Dave powering up ASC
19:38 UTC DAQ restarted
20:00 UTC SUS BS WD tripped. Reset.
20:08 UTC Travis to BSC area to drop off equipment.
20:12 UTC Jeff K., Hugh, Jim to HAM3 for B&K measurments. Jeff K. then to BSC for violin mode measurements.
Peter to PSL enclosure
20:39 UTC Jason to optics lab to retrieve parts
20:45 UTC Robert back
20:52 UTC HAM5 ISI WD tripped. Reset. Tripped again. Left tripped.
21:29 UTC Peter back
21:47 UTC Travis to bier garten to help with violin mode measurements
Delivery from RDL for Gerardo through gate. Kyle received.
22:07 UTC Cheryl to optics lab

Jeff and Jim back, Robert to BSC chambers

23:27 UTC Reset ITMX SUS WD and rerequested ALIGNED. Reset HAM5 ISI WD.
Comments related to this report
betsy.weaver@LIGO.ORG - 08:33, Wednesday 27 September 2017 (38803)

Robert reports that he wiped the floor of the BSC2 chamber when he went in there.  Subsequently, we have been wiping BSC 1-3 floors as we go in ~each time since.