(Fil, Marc, Daniel)
We rearranged the ISC-CER racks to comply with the most recent drawing version. This includes the reshuffling of the tip-tilt drivers into the sus racks as well as adding the RF generation for the squeezer. We are still missing a 384-chn BIO and an RF amp concentrator. Most of the cabling for the new chassis is still missing as well.