Since the HPO is still running, regular HPO maintenance must still be performed regardless of the ongoing vent.  Therefore, today I completed the weekly PSL FAMIS tasks.

HPO Pump Diode Current Adjust (FAMIS 8441)

After 3 weeks of no adjustment due to the NPRO swap in the 35W FE, I adjusted the operating current and temperature of the HPO diode boxes; the changes are summarized in the below tables.  All work was done with the ISS OFF; a screenshot of the PSL Beckhoff main screen is attached for future reference.

HPO DB Operating Currents
  Operating Currents (A)
Old New
DB1 50.2 50.4
DB2 52.8 52.9
DB3 52.8 52.9
DB4 52.8 52.9

 

HPO DB Operating Temperatures
  Operating Temperatures (°C)
DB1 DB2 DB3 DB4
Old New Old New Old New Old New
D1 28.0 27.5 19.5 19.5 21.0 21.0 23.0 22.0
D2 28.0 27.5 19.0 19.0 25.0 25.0 20.5 19.5
D3 28.0 27.5 20.0 20.0 25.0 25.0 22.0 21.0
D4 28.0 27.5 18.0 18.0 22.0 22.0 20.5 19.5
D5 28.0 27.5 18.0 18.0 26.0 26.0 22.5 21.5
D6 28.0 27.5 18.5 18.5 20.5 20.5 22.5 21.5
D7 28.0 27.5 19.0 19.0 21.5 21.5 22.5 21.5

The ISS is back ON and the HPO is outputting 153.0 W.  This completes FAMIS 8441.

PSL Power Watchdog Reset (FAMIS 3669)

I reset both PSL power watchdogs at 16:55 UTC (9:55 PDT).  This completes FAMIS 3669.