Reports until 16:08, Tuesday 26 September 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:08, Tuesday 26 September 2017 (38792)
Ops Day Shift Summary
Ops Shift Log: 09/26/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for vent
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Continuing with vent work   

 

Activity Log: Time - UTC (PT)
15:00 (08:00) Start of shift
15:30 (08:30) Hugh & Jim – Working at HAM3 & HAM5
15:35 (08:35) Betsy & Crew – Mounting arm at BSC3
16:22 (09:22) Corey – In LVEA to reset dust monitor #5
16:20 (09:20) Norco on site – N2 delivery to CP-8
16:30 (09:30) Linen Service on site to change out door mats
17:03 (10:03) Brian from Apollo on site
17:44 (10:44) Karen – Going to End-Y
17:51 (10:51) Hugh & Jim – Out of LVEA
18:20 (11:20) Corey – Going to Squeezer Bay to drop off parts
18:44 (11:44) Karen – Finished at End-Y
18:46 (11:46) Betsy, Travis, TJ – Out of the LVEA
19:45 (12:45) Norco on site – N2 delivery to CP-3
20:15 (13:15) Aidan & TJ – Going to End-Y to work on TCS  
20:16 (13:16) Ed – Going into LVEA to remove a squeezer chassis  
20:28 (13:28) Ed – Out of the LVEA
20:39 (13:39) Corey – Going to HAM2
20:48 (13:48) Jason & Alastair – Going to TCS-Y table
20:57 (13:57) TJ – Back from End-Y – Going into LVEA to work with Jason & Alastair
21:02 (14:02) Betsy – Going into the LVEA
21:22 (14:22) Dave – DAQ restart for changes to H1SUS… and H1SUSAUX…
21:37 (14:37) Travis – Going to BSC3
21:45 (14:45) Amber - Tour through the control room