Shot elevations with the Optical Auto-Level on the HAM3 Optical Table--Will report separately.
HAM5--All Damping installed except the Horz GS13 Can damper on Corner3 East Side tucked into the space with the HAM6 Septum. B&K hammering was completed and TMDs await retuning. The Blade access walls have NOT been replaced. Once TMDs are ready, will need about 2 hours to get all back buttoned up.
MISC--Packed a couple CC wafers away. Pulled ISI Oplev Mirror, undogged SR3 front baffle-it is still on the table.