Displaying report 1-1 of 1.
Reports until 08:10, Wednesday 27 September 2017
LHO General
thomas.shaffer@LIGO.ORG - posted 08:10, Wednesday 27 September 2017 (38800)
Ops Day Shift Transition

TITLE: 09/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.13 μm/s
QUICK SUMMARY: Plan for today includes: HAM2/3 IO work, BSC3 ITMX removal, HAM5 SRM optic swap, HAM5 feedthroughs, TCS local lazer hazard.

 

Displaying report 1-1 of 1.