Reports until 16:02, Wednesday 27 September 2017
H1 TCS (TCS)
Link
aidan.brooks@LIGO.ORG -
posted 16:02, Wednesday 27 September 2017
(38801)
LHO TCS maintenance items - day 3 status
LHO TCS maintenance tasks (day 3) per
T1700136
:
Synchronize Guardian between sites [AH]:
Automated heating beam profiling [AH]:
Investigate glitching H1CO2Y flow meter [AB/AH]:
(see
aLOG 38811
)
Install flipper mirrors and annular heating beam masks [AB/AH]:
(see
aLOG: 38812
)
Make CO2 power cable feedthrough more rigid
Install summing chassis
Update operating system to Debian for HWS. Start with ETM HWS
Add HWS image viewer
(see
aLOG 38774
)
Clean up TCS MEDM screens
(see
aLOG 38774
)
Modify RH drivers to work as three wire RTDs (ITMX, ITMY, ETMY).
(see
aLOG 38785
)
Transfer spare CO2 RTDs to laser surface.
(see
aLOG 38806
)
Adjust flow rate sensor to have same settings at LLO - averaging set to 5s
(CO2X see
aLOG 38793
, see
aLOG 38809
)
Add temperature estimate to ring heater in Beckhoff (measured resistance vs nominal resistance).