TITLE: 09/28 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: ITMX has been removed. HAM2/3 work continues.
LOG:
- 15:06 Alastair to LVEA to turn on TCS lasers
- 15:51 Travis into LVEA to grab a stool
- 15:52 Jeff B, Betsy to HAM5
- 16:01 Transitioning to laser safe
- 16:15 Cheryl, Ed to HAM2/3
- 17:05 Hugh to HAM5 to work on feed throughs
- 17:39 Cheryl, Ed out, Corey in
- 18:05 Karen, Vanessa to MX then MY
- 18:13 Travis to HAM5 to check on progress
- 18:21 Travis out
- 18:23 Ed going to meet Cheryl at HAM2
- 18:28 Ed out
- 18:31 Cheryl out for lunch
- 19:04 Betsy, Hugh out, Cheryl transitioning to laser Hazard. Keita, Ed joining as well
- 19:32 Corey to HAM2/3
- 19:52 Peter K to PSL/HAM2/3
- 20:32 Betsy ITMX removal, Keita and reporter to LVEA
- 20:54 Kyle and visitors to LVEA
- 21:03 Travis to ITMX
- 21:07 Keita and guest out of LVEA
- 21:58 Kyle and visitors out and headed down the Y arm near end station
- 22:00 HAM2/3 crew out
- 22:06 Jeff K to ITMX to take pictures
- 22:15 Dave, Carlos power cycling the digital cameras
- 22:30 Cheryl, Corey, Ed to HAM3