Reports until 15:46, Thursday 28 September 2017
H1 AOS (TCS)
alastair.heptonstall@LIGO.ORG - posted 15:46, Thursday 28 September 2017 (38830)
Fiber pulling lab status

[Alastair, Travis]

I wanted to check on the general status of everything in the fiber pulling lab ahead of scheduled monolithic installs.  The fiber pulling machine and profiler have had their computers replaced recently and both are running fine.  I pulled a fiber and profiled it, and it meets required shape criteria.  Everything seems good to go down there.  We should order more of the practice stock material (Suprasil 2, 3mm diameter) as that is running low.