TITLE: 09/29 Partial Day Shift: 17:30-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: Covered from 17:30 - 23:00 UTC 17:56 UTC Corey out. Keita can transition LVEA to laser hazard. 17:59 UTC Ed out. 18:09 UTC Keita done transitioning LVEA to laser hazard. 18:32 UTC Alastair starting run along X arm. 19:07 UTC Greg G. to LVEA. 19:20 UTC Cheryl, Keita, Ed, Corey: align beam in PSL enclosure to HAM2 and IO work on HAM2 and HAM3. 20:36 UTC Travis to HAM5 and HAM6 area. Rearrange cleanrooms. Radius of curvature actuator. Not in chamber. 21:28 UTC Travis done. 22:10 UTC Filiberto and Peter to mid Y to pick up power supply. 22:22 UTC Cheryl, Keita, Ed, Corey back to HAM3. 22:44 UTC Aidan to LVEA to check if the X arm CO2 thermal imaging camera is on. 22:50 UTC Aidan back. 22:59 UTC Kyle taking visitors around LVEA.