Reports until 16:18, Friday 29 September 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:18, Friday 29 September 2017 (38842)
Ops Partial Day Shift Summary
TITLE: 09/29 Partial Day Shift: 17:30-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

Covered from 17:30 - 23:00 UTC

17:56 UTC Corey out. Keita can transition LVEA to laser hazard.
17:59 UTC Ed out.
18:09 UTC Keita done transitioning LVEA to laser hazard.
18:32 UTC Alastair starting run along X arm.
19:07 UTC Greg G. to LVEA.
19:20 UTC Cheryl, Keita, Ed, Corey: align beam in PSL enclosure to HAM2 and IO work on HAM2 and HAM3.
20:36 UTC Travis to HAM5 and HAM6 area. Rearrange cleanrooms. Radius of curvature actuator. Not in chamber.
21:28 UTC Travis done.
22:10 UTC Filiberto and Peter to mid Y to pick up power supply.
22:22 UTC Cheryl, Keita, Ed, Corey back to HAM3.
22:44 UTC Aidan to LVEA to check if the X arm CO2 thermal imaging camera is on.
22:50 UTC Aidan back.
22:59 UTC Kyle taking visitors around LVEA.