Displaying report 1-1 of 1.
Reports until 12:47, Monday 02 October 2017
H1 TCS (CDS)
filiberto.clara@LIGO.ORG - posted 12:47, Monday 02 October 2017 (38853)
TCS Table Enclosures

Field cabling to the TCS tables have been documented and disconnected. The following items were powered off prior to disconnecting cables:

1. Power to the TCS racks - DC Supply Sequencer
2. High voltage power supplies in CER mezzanine
3. High voltage power supply in Mechanical Room mezzanine
4. TCS chillers

Non-image files attached to this report
Displaying report 1-1 of 1.