Field cabling to the TCS tables have been documented and disconnected. The following items were powered off prior to disconnecting cables:
1. Power to the TCS racks - DC Supply Sequencer
2. High voltage power supplies in CER mezzanine
3. High voltage power supply in Mechanical Room mezzanine
4. TCS chillers