Displaying report 1-1 of 1.
Reports until 16:10, Monday 02 October 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:10, Monday 02 October 2017 (38860)
Ops Day Shift Summary
Ops Shift Log: 01/02/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for vent work
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Vent work is underway.
Ran dust monitor checks – All OK except HAM2, which a power cycle fixed.
Vent work continues apace.   

 

Activity Log: Time - UTC (PT)
15:00 (08:00) Start of Shift
15:58 (08:58) Travis – Going to Biergarten to prep for ITM work
16:00 (09:00) Greg & Tvo – Working on TCS Table(s)
16:14 (09:14) Jim – SEI work at HAM5
16:15 (09:15) Jason – In LVEA to check status of TCS lasers and chillers
16:35 (09:35) Filiberto – Going into LVEA to work with TCS crew on tables
16:55 (09:55) Marc – Going to Mid-Y to look for electronics parts
17:06 (10:06) Ed – Going to work on camera setup in HAM2
17:55 (10:55) Jason – Going back into LVEA to assist with laser welder in Biergarten
18:02 (11:02) TJ – Going into Optics Lab
18:52 (11:52) Jason, Betsy, and Travis – Out of the LVEA
19:59 (12:59) Cheryl – Transition LVEA to Laser Hazard
20:16 (13:16) Cheryl – Going to HAM2
20:37 (13:37) Koji – Going into Optics Lab
21:21 (14:21) Travis – Going into LVEA West Bay to look for parts
21:22 (14:22) Jason – Going to Biergarten to stage for welding work
21:55 (14:55) Koji – Out of Optics Lab
21:55 (14:55) Travis – Out of the LVEA
22:10 (15:10) Sheila – Going to End-X
22:33 (15:33) Sheila – Back from End-X
22:50 (15:50) Jason – Out of the LVEA
23:00 (16:00) End of shift
 