Ops Shift Log: 10/03/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Support: X
Incoming Operator: N/A
Shift Summary: Vent continues. Won Nobel Prize! Way to go LIGO.
Activity Log: Time - UTC (PT)
15:00 (08:00) Start of shift
15:10 (08:10) Porta-Potty on site
15:16 (08:16) Chris – Escorting pest control around site
15:18 (08:18) Chandra, Gerardo, & Kyle – In LVEA to install TMDS flange (WP #7157)
15:28 (08:28) Norco on site to deliver N2 to CP6
15:54 (08:54) Karen – Going to End-X
16:03 (09:03) Travis – Going into Biergarten
16:10 (09:10) Filiberto – Going to HAM6 to pull cable for squeezer
16:45 (09:45) Karen – Done at End-X coming back to CS
17:15 (10:15) Norco from CP6 leaving site
17:20 (10:20) Cintas on site to service mats
17:26 (10:26) Norco on site to deliver N2 to CP1
17:35 (10:35) Dave – Update models and restart the DAQ
18:02 (11:02) Paradise Water on site to service bottled water
18:08 (11:08) Filiberto – Going to pull cables at HAM6
18:10 (11:10) Karen – Going to End-Y
18:15 (11:15) Corey – Going to HAM2/3 area to look for parts
18:21 (11:21) Betsy & Travis – Going to Biergarten
18:22 (11:22) Pest control finished and leaving site.
18:24 (11:24) Ed – Going to HAM2 to align camera
18:33 (11:33) Dave – DAQ restart
19:03 (12:03) Jeff K. – In LVEA to take pictures of ITM work
19:07 (12:07) Jason – Going to Biergarten to setup survey equipment
19:13 (12:13) Karen – Leaving End-Y
19:25 (12:25) Jason – Out of LVEA
20:28 (13:28) Jim & TJ – Going to HAM5 to install baffles
21:03 (14:03) Ed – Going to HAM2 for IO work
21:13 (14:13) Filiberto – Cabling work at HAM5/6
21:24 (14:24) Betsy – Going to check on Baffle and ITM work
21:40 (14:40) Cheryl – Going to HAM2
22:12 (15:12) Betsy – Out of the LVEA
22:43 (15:43) Cheryl & Ed – Out of the LVEA
22:45 (15:45) Turn over to Ed