Displaying report 1-1 of 1.
Reports until 08:28, Wednesday 04 October 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:28, Wednesday 04 October 2017 (38885)
Ops Day Shift Start
Ops Shift Transition: 10/04/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: Unlocked for vent 
Intent Bit: Engineering
Weather: Clear with scattered clouds; Winds Clam to a Light Breeze; Temperatures in the 40s
Primary 0.03 – 0.1Hz: N/A
Secondary 0.1 – 0.3Hz: N/A
Outgoing Operator: N/A
Quick Summary: Continuing vent work
Displaying report 1-1 of 1.