Ops Shift Transition: 10/05/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Weather: Clear, cool, and light winds
Primary 0.03 – 0.1Hz: N/A
Secondary 0.1 – 0.3Hz: N/A
Outgoing Operator: N/A
Quick Summary: Continued work on upgrades to the IFO