Reports until 19:50, Thursday 05 October 2017
H1 IOO
Link
cheryl.vorvick@LIGO.ORG -
posted 19:50, Thursday 05 October 2017
(38912)
IO work in HAM2 and HAM3 Thursday October 5th
improved flashing of the IMC
HWP installed before the Faraday to check both the main beam and the forward rejected beam from CW1
beam going through the FR centered
beam aligned to PRM
PRM aligned to send REFL to HAM1 and to send the misaligned REFL to the roof beam dump
with a well flashing IMC, the bypass is not necessary to see the beam after the PRM, bypass not installed
by eye the beam after the PRM was going over the position where the iris markers are installed
ROM RH2, which steers IM1 trans (which is IMC Trans) to IOT2L was realigned and repositioned today
TO DO:
torque bolts on IM3 and check alignment
install PRM and PR2 irises and check the beam
swap out optics that sent the beam to the old IOT2R and swap a BS in the ISS path
check the ISS
B&K hammer the IMs and the REFL periscopes
- Ed, Keita, Cheryl