Went over items on the White Board. Monday is piled on because it both has items which carry on through the week and also tends to have items carrying on from previous week. Below are some items I was able to jot down some notes for:
- Bugs in the LVEA! There is an infestation of non-flying & slow bugs in the LVEA. Please be mindful of this when starting in-chamber work & remove/kill insects before opening up any chambers.
- IO Work continues: Mainly mechanical work over next few days. IO will only need LASER SAFE from Mon-Wed this week.
- HAM5 Opening: Bubba noted there was an opening on a HAM5 door--cloth cover was not covering entire door.
- Vacuum System work: Multiple ongoing activities noted.
- HAM6 Broken Glass: Discussion of whether this needs to be recorded in a report.
- PSL Slow Water Leak: This could take up to a full day & will take place on Wed.
- HVAC Controller Work: Apollo continuing this work. Will need to watch temperatures in the LVEA & Kissel put an LVEA temperature strip tool up nuc0 in the Control Room.
- Went Over Work Permits
Re broken glass, see alog:
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=38918