H1 SUS (DetChar, SQZ)
jeffrey.kissel@LIGO.ORG - posted 11:54, Monday 09 October 2017 (38939)
H1 OMs 1-3 EPIC Infrastructure Resinstalled; Not Yet Tested Because In-Air Cabling Not Yet in Place
J. Kissel, D. Barker, R. McCarthy

As was done with RMs last week (see LHO aLOG 38883) I've re-populated the EPICs records and foton filters for H1 SUS OM1, OM2, and OM3 after having moved them over from the old h1sushtts.mdl front end model to the h1susomc model. 

Having reminded myself of all that was needed with the RMs (including DAMP and COILOUTF gains), I believe I've covered all bases. 

Several Things of Note:
- I've gone back to the RM_OVERVIEW and HSSS_OVERVIEW screens because the GDS_TP screen was incorrectly still pointing to the H1SUSHTTS GDS TP screen of the OMs. So, I created a new macro variable MASTERMODEL (and lowercase mastermodel) in all of the HSSS macro files (rmall, omall, imall, and each individual file).

- We also have compiled and installed the new h1susauxh56 to pick up all the new SUS' coil driver monitoring.

- I have NOT yet updated / created a new safe.snap for the h1susomc model that includes the OMs.

- I have not bothered to restore alignment offsets. 

In-air cabling and electronics (re)install for OMs is not yet complete -- in addition to the front-end / IO chassis ADC and DAC card shuffle, which is complete -- the OMs' feedthrough exit out of HAM6 are getting re-arranged to make room for all the new SQZ elements in HAM6 and the former in-air cabling is just ~10 ft. too short. As such, we won't get the chance to confirm /test that all the digital infrastructure has been restored properly until that stuff gets finished.