In anticipation of attaching AOSEMs to the OFI for HAM5, I laid out a string of the appropriate cables and AOSEMs next to the chamber on a staging table. I've fastened to the table the clean-to-dirty ribbon-feedthru-simulator-cable to the table and Fil has run a grey temp out of vac cable from it to the sat amp located on the other side of the chamber. So, the OFI guys can test fit and test the new AOSEMs and their brackets when ever they are ready.
The cables and AOSEMs are:
D1000234-88" S/N 932
D1000225-230" S/N S1104240
D0901065 S/N 525, 559, 511