ITMx and ITMy progress today

ITMx:

The first half of the day was spent packing up welding and IAS equipment and converting the space from a laser enclosure welding area to a install/assembly area.  I then replaced the middle wire segment (from top mass to UIM) that was broken during the extraction of the lower structure.  I also added the UIM non-magnetic blade dampers (NMBDs) to the blades of the main chain and removed the unused copper ECD blocks as per E1600011.  We then called Fil in to start looking into an FRS 4509 (ringheater RTD sensor non-functional).  Fil will continue this work tomorrow.

ITMy:

With Fil working on RH issues on ITMx and Garilynn visiting this week to commission the new baffle alignment equipment, we redirected our effort to ITMy.  We got as far as swinging back the ACB (Note: we had to un-swing-away the ITMx ACB since we only have one wedge, but will hopefully have another arrive in the mail from LLO shortly) and putting on optic face shields.  It is NOT locked yet. 

Comments related to this report
travis.sadecki@LIGO.ORG - 16:42, Tuesday 10 October 2017 (38980)

NMBDs installed on ITMx are serial numbers 015 and 016.