TITLE: 10/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
15:15 Vent meeting
15:57 Travis and Betsy ou to the biergarten
16:00 Jason and TJ out to LVEA
17:44 Jason out to HAM5
18:05 Travis and Betsy out
18:29 Jason and Garilynn out
18:40 TJ out for lunch
18:54 Bubba and crew taking the HAM4 South door off (started earlier, not sure when)
19:00 Dave B having Dolphin issues and the CDS overview is quite red with TCS Chiller imminent on Verbal Alarms and the PSL PMC not unlocked
19:05 Dave B out to EY to investigate Dolphin issue.
19:23 Dave back
20:00 Untripping IMs
20:02 Untripping MCs
20:03 Untripping PRs
20:05 Untripping BS
20:06 Untripping SRs20:12 Reset PSL EPICS alarm and readjusted ISS Diffracted Power
20:25 Marc to MY
20:39 Cheryl out to HAM2
20:44 Jason out to BSC1
20:57 Marc back
22:10 Betsy and Travis back out to biergarten