Reports until 16:07, Friday 13 October 2017
H1 General
edmond.merilh@LIGO.ORG - posted 16:07, Friday 13 October 2017 (39019)
Shift Summary - Day

TITLE: 10/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

15:09 Garilynn into the LVEA

15:17 Betsy into biergarten

15:35 TJ out o HAM5 and then HAM2

15:39 Peter and Jeff heading ino PSL for water leak mitigation

17:04 Marc to MY

17:05 TJ out for a quick break

17:09 Gerardo into HAM5

17:36 Travis, Betsy, and Greg out of LVEA

18:12 TJ and Cheryl out to HAM2

18:15 Marc Back from MY

19:20 Gerardo ad Peter out to HAM5

19:21 Greg to biergarten to prepare chambers fo Monday work

19:27 TJ out for lunch

20:34 Gerardo and Peter back and Peter into the optics lab

20:49 Greg out and gone for the day

21:22 Arnab out to Y Cryopump area with Kyle

21:32 Richard out to CER

21:43 Peter and Gerardo out