Came into the Control Room at 8:45am(after the GW170817 press conferences)
Day's Activities:
- HAM4 work locking up the ISI & collect contamination samples (Hugh)
- 17:20- 17:47 Removing MC1 iris from HAM2 (Ed)
- 18:05 Staging parts for TCS work (TJ & John Richardson)
- 18:09 Recon HAM2 for baffling work (Jim)
- 20:17 HAM2 Baffle Checks (Jim & TJ)
- 20:43 PSL Crystal (top) Chiller topped off (Richard notified us of beeping, and Ed filled w/ 375mL)
- 21:36-23:00 OFI work at HAM5 (Gerardo, Peter)
- 22:30 Inside H1 PSL (Peter)