Reports until 08:10, Thursday 19 October 2017
H1 General
edmond.merilh@LIGO.ORG - posted 08:10, Thursday 19 October 2017 (39086)
Shift Transition - Day

TITLE: 10/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 16mph Gusts, 12mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.58 μm/s
QUICK SUMMARY:

uSei is over the 90%ile mark