TITLE: 10/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
Rising uSeism has all three axis above 90th percentile mark
15:15 Morning Vent Meeting
16:10 Hugh headed out to HAM4 to work on dampers
16:28 Travis out to ITMX
17:15 Received Benton County Code Red TEST phone call.
17:27 Richard out to CER to check out ISC cabling
17:34 Richard out
17:45 Jim working in HAM2
18:42 Jim back
19:16 Hugh back from HAM4
19:26 Jeff K out of HAM2 for lunch
19:54 Set ETM SEI platform to "damped" and turned off sensor correction
20:03 Travis back out to ITMX
20:05 Jeff is going out to meet Travis
20:45 Peter into Optics Lab
22:23 Peter back