Doors went back on HAMs 8 and 9, and HAM 7 was prepped for entry Monday (including removal of IOT7 and ISCT7 enclosures). We had a very brief power outage in the morning and appear to have recovered, except for the possible death of h0pemms. Richard has also installed a camera for outreach purposes along the Y-arm in the LVEA, looking towards the BSC8/HAM10 area, to catch the upcoming single-arm work.