Displaying report 1-1 of 1.
Reports until 08:37, Friday 20 October 2017
H1 General
edmond.merilh@LIGO.ORG - posted 08:37, Friday 20 October 2017 (39101)
Shift Transition - Day

TITLE: 10/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 9mph Gusts, 6mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.68 μm/s
QUICK SUMMARY:

Subbing in for Cheryl. High winds overnight have calmed. uSeiesm has leveled off just above te 90th 5ile line with EQ bands sympathizing with the elevated motion.

 

Displaying report 1-1 of 1.