The laser may be turned on in the squeezer bay. This creates a laser hazard at height. 4 rails and a panel are in the oven and will be scanned today B&K measurements have been taken for all IMs Apollo will be back today to put AH1 into the new FMCS control system Corey will be replacing damaged black glass in HAM6 Corey will install an optic in a tip tilt suspension in HAM5 Corey will install viton on an OMC baffle GV6 may be closed today Robert wants to measure the resonances of the ITMX elliptical baffles