TITLE: 10/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 15:42 - 19:29 UTC Jeff K. to LVEA to take in chamber violin mode measurments of ITMX 15:48 - 15:53 UTC Travis to bier garten to get 1st contact for Corey 16:27 - 17:47 UTC TJ to HAM5 to put target on SR3 16:32 - 17:53 UTC Jason to BSC1 to check the aux alignment laser assembly in front of ITMY 16:42 UTC Travis to bier garten to help Jeff K. with violin mode measurements 16:45 UTC Betsy to BSC1 to look at elliptical baffle alignment 16:50 UTC Chris to end Y chiller yard to check a filter 16:54 UTC Gerardo toggling PT124 off/on 18:02 UTC Kyle WP 7186 18:16 UTC Corey to optics lab to clean optics for tip/tilt 19:07 - 23:02 UTC Peter to optics lab 19:12 UTC Robert to LVEA to prep for BSC entry 19:13 UTC Chandra going for jog along X arm 19:29 UTC Jeff K. reports Travis and Betsy are back 19:44 - 19:52 UTC Jeff K. to CER to take pictures for Rolf 20:07 UTC Travis back to ITMX to continue violin mode measurements 20:30 UTC Betsy to BSC1, XBM, ITMY alignment 20:38 UTC Jeff K. back to ITMX to continue violin mode measurements 20:56 - 22:18 UTC TJ to table by HAM4 to rebag hardware 21:03 UTC Corey to cleaning area to grab flashlight 21:16 UTC Robert back for lunch 22:49 UTC Jeff K. back, reports Robert measuring elliptical baffle resonances, Betsy and Travis still in chamber