Hugh hit a stopping point on the last ISI damper install since he needed access to the bolts under the SR2 suspension. Since we are planning to translate that suspension per a new ECR anyway, I marked it's pointing on 2 faces of it's base with dog clamps and then slid it out of the way for Hugh. He is continuing his work now.
Also had to do a similar mark-with-dogs and move the newly aligned 4" Siskiyou mirror that was also sitting on holes that Hugh needed to access...