Reports until 16:15, Wednesday 25 October 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:15, Wednesday 25 October 2017 - last comment - 16:36, Wednesday 25 October 2017(39167)
Ops Shift Summary
TITLE: 10/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

14:15 UTC Peter to optics lab
16:11 UTC Jim, TJ, Steven processing baffle hardware
16:33 UTC Ed in CER, mods for all HAM ISI coil drivers
16:38 UTC Karen to mid Y
16:41 UTC Travis to bier garten to work on ITMX alignment
16:45 UTC Hugh to HAM4 to work on ISI damping
16:48 UTC Corey installing mirror for squeezer tip/tilt in HAM5
16:50 UTC Snowvalley here to see Bubba
16:53 UTC Betsy to BSC3
16:53 UTC Peter back
17:27 UTC Kyle, Rakesh WP 7189
17:27 UTC Karen leaving mid Y
Kyle craning cart over YBM
17:49 UTC Thomas and Greg to go into BSC2/3 to lock down ellipitical baffles
18:04 UTC Peter back to optics lab
18:11 UTC Fire department here to check on a box
18:50 UTC Jim, TJ, Steven done. Were unpackacking equipment in clean room near HAM2.
18:52 UTC Peter back
18:52 UTC Ken from Hanford radio here to meet with fire department about issue with RAFAR box
19:08 UTC Betsy and Travis out for lunch
19:19 UTC Hugh out of the LVEA
19:58 UTC Thomas done
19:58 UTC Peter back to optics lab
20:09 UTC Corey to HAM5 to continue work on tip/tilt mirror
20:48 UTC Betsy and Travis back to ITMX
20:55 UTC Ed to HAM2 to help Filiberto and Marc (pulling fiber?)
22:00 UTC Site weekly meeting
22:36 UTC Keita and Corey back to HAM5
22:47 UTC TJ, Jim, Steven done installing all baffles in HAM2 except table baffle. Done for day.
22:58 - 23:00 UTC Jeff K. retrieving B&K hardware from near HAM2
Comments related to this report
patrick.thomas@LIGO.ORG - 16:36, Wednesday 25 October 2017 (39171)
23:36 UTC Ed done for the day