TITLE: 10/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 17mph Gusts, 12mph 5min avg
Primary useism: 0.06 μm/s
Secondary useism: 0.28 μm/s
QUICK SUMMARY:
14:18 Kissel in early to do some more B&K hammering in HAM2
15:33 (HFD) MSA on site for Bubba
16:05 Kissel out for vent meeting
16:12 more MSA on site for RFAR testing
16:44 Gerardo is in the HAM5 area
16:55 Chandra going in chamber with Betsy and Travis - X Manifold
16:57 Travis heading out to biergarten
17:10 Betsy ou to he biergarten
17:15 Gerardo is out
17:25 Gerardo and Peter into Optics lab
17:27 Fil out to LVEA to put plastic conduit arounf fibers that were pulled on Friday
17:43 Job Shadow student on site
17:44 TJ heading out to HAM 4/5 area.
17:55 Richard and shadow student into LVEA for tour
18:08 Greg into LVEA to take measurements for TCS table
18:18 Kyle to the Y end station
18:27 Noise Eater out of range alarm
18:54 Travis out to reset the Noise Eater
19:13 I will be turning ops over to Corey so I can assist with HAM2 in-chamber work