H1 General
edmond.merilh@LIGO.ORG - posted 08:32, Monday 30 October 2017 - last comment - 12:14, Monday 30 October 2017(39200)
Shift Transition - Day

TITLE: 10/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 17mph Gusts, 12mph 5min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.28 μm/s
QUICK SUMMARY:

14:18 Kissel in early to do some more B&K hammering in HAM2

 

Comments related to this report
edmond.merilh@LIGO.ORG - 12:14, Monday 30 October 2017 (39210)

15:33 (HFD) MSA on site for Bubba

16:05 Kissel out for vent meeting

16:12 more MSA on site for RFAR testing

16:44 Gerardo is in the HAM5 area

16:55 Chandra going in chamber with Betsy and Travis - X Manifold

16:57 Travis heading out to biergarten

17:10 Betsy ou to he biergarten

17:15 Gerardo is out

17:25 Gerardo and Peter into Optics lab

17:27 Fil out to LVEA to put plastic conduit arounf fibers that were pulled on Friday

17:43 Job Shadow student on site

17:44 TJ heading out to HAM 4/5 area.

17:55 Richard and shadow student into LVEA for tour

18:08 Greg into LVEA to take measurements for TCS table

18:18 Kyle to the Y end station

18:27 Noise Eater out of range alarm

18:54 Travis out to reset the Noise Eater

19:13 I will be turning ops over to Corey so I can assist with HAM2 in-chamber work