Displaying report 1-1 of 1.
Reports until 16:33, Wednesday 25 October 2017
H1 SYS
thomas.shaffer@LIGO.ORG - posted 16:33, Wednesday 25 October 2017 - last comment - 09:39, Monday 30 October 2017(39170)
HAM2 baffles all finished up

J. Warner, S. Appert, T. Shaffer

We had some unexpected time to work on HAM2 baffles after some FedEx kerfluffles, so Jim and I went into HAM2 with some freshly baked parts and an engineer (just in case things got out of hand). This work went really fast with the three of us and we managed to finish up PRM, the last beard baffle, align all of the panels we needed to, and then torque and cap everything. I went into the beam tube to work from there and to be the eyes to align, and of course, I wiped on my way out.

We left the table baffle that sits in front of PR3 off the table for now, but with the mounts bolted down. This way the other crews that still need to do work have a little bit of space to work and won't scratch anything, hopefully. To place this last panel will take only a minute or two so we can easily do it after the major work is all done.

Pictures to come.

Comments related to this report
thomas.shaffer@LIGO.ORG - 09:38, Monday 30 October 2017 (39204)

Attached photos of the baffles on HAM2. The table baffles in front of PR3 are waiting to be installed, as the pictures will reflect.

Images attached to this comment
thomas.shaffer@LIGO.ORG - 09:39, Monday 30 October 2017 (39205)

Two more.

Images attached to this comment
Displaying report 1-1 of 1.