Reports until 08:17, Tuesday 31 October 2017
H1 General
edmond.merilh@LIGO.ORG - posted 08:17, Tuesday 31 October 2017 - last comment - 10:14, Tuesday 31 October 2017(39221)
Shift Transition - Day

TITLE: 10/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 9mph Gusts, 7mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.15 μm/s
QUICK SUMMARY:

Comments related to this report
edmond.merilh@LIGO.ORG - 10:14, Tuesday 31 October 2017 (39224)

Corey taking over so I can do IO work:

15:15 Chris into LVEA

15:18 Norco with LN2 to EX (80)

15:49 Hugh to HAM6 to work on cable dressing

15:54 Chris out

16:04 Betsy out to the floor for parts

16:20 Krishna and Jim out to EX

16:30 Chris to both end VEAs

16:46 Betsy to ITMX

17:00 Gerardo into optics lab