TITLE: 10/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 9mph Gusts, 7mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.15 μm/s
QUICK SUMMARY:
Corey taking over so I can do IO work:
15:15 Chris into LVEA
15:18 Norco with LN2 to EX (80)
15:49 Hugh to HAM6 to work on cable dressing
15:54 Chris out
16:04 Betsy out to the floor for parts
16:20 Krishna and Jim out to EX
16:30 Chris to both end VEAs
16:46 Betsy to ITMX
17:00 Gerardo into optics lab