[Spelling Ed from DAY Ops Shift duties so he can join IO Team for HAM2 activities.]
Day's Activities:
- Continuing Activities: (1) EX BRS work (Krishna/Jim), (2) ITMx work cont (Betsy), (3) Optics lab (OFI?) work (Gerardo)
- 17:18 Liquid Nitrogen truck for MY's CP3 (#74)
- 17:19 Transitioning to Laser HAZARD (Ed)
- 17:20 HAM6 cable dressing COMPLETED (Hugh)
- 17:34 Taking Camera to BSC3 crew (Jeff)
- 17:34 Making BRDs for ITMx in Optics Lab (Jeff)
- 17:36 HAM5 Work (Baffle work, Tip Tilt Beam dump, SR3 target removal) [TJ]
- 17:41 IO Work at HAM2 (Cheryl, Ed)
- 18:02 Inspect high voltage cable for Y2-8 ion pump (Fil)
- 18:12 SEI ISI model work (Dave)
- 18:19 Mat (Cintas?) contractor
- 18:48-18:55 LN2 Truck reported stuck (Christina)
- 18:53 DAQ Restart for model change (Dave)
- 20:05-22:25 ITMx work cont (Betsy, Travis)
- 20:10 EY SEI work (Krishna, Jim)
- 20:24 (At Jim's request) Took ISI CONFIG from SC_OFF_NOBRSXY --> LARGE_EQ_NOBRSXY
- 20:45 IO work cont (Cheryl, Ed, Keita)
- 20:48 Pump Cart at EX for Krishna (Kyle, Rakesh)
- 20:51 OFI work cont (Gerardo)
- 21:15 EY Y2-8 Ion Pump work (Fil, Liz)
- 22:12 EY Beam tube work (Arnab, Chandra, Kyle Rakesh)
- 22:23 LVEA Laser SAFE
- 22:58 Un-tripped IM4 & Damped.