This afternoon, Travis and I finished moving the SR2 into it's new position 5mm closer to the BS (+Y). We had to jockey dog clamps and pushers to do this, attempting to hold the pointing of the suspension as close to it's previous condition as possible. Of course, we will realign this suspension ~next week when we run the PSL beam through the corner from PR to SR and everything inbetween. (We need to resuspend the SR2 and check for health via TFs first, as well as fix the SR2 UL M2 AOSEM, and finish HAM3 and elliptical baffle builds.)
While on HAM4, I reseated the 4" HWS mirror/mount that I moved last week, and we removed all tools and misc hardware lingering from the HAM4 work thus far.