Yesterday, Ed and I removed all of the temporary IO hardware from HAM2 and HAM3.
This included:
- HAM2: MC1 iris, MC3 iris, HWP after IM1, PRM iris and iris marker hardware, HAM2 raised access platform (four 18" x 1.5" posts, and an 18" x 24" stainless breadboard
- HAM3: MC2 iris, PR2 iris, PR2 iris marker hardware, OpLev optic in it's iLigo class-A mount
Notes:
- OpLev mount and optic are wrapped for transport from HAM3 to HAM2 cleanrooms, but is not yet wrapped for storage
- irises are all on a tray, with foil covering the irises
- we did not have time to wrap and bag the IO hardware
New Iris Markers:
- I installed the new low profile iris markers for MC1 and PRM
- after installing them, I noticed that part of the hardware was not sitting flat to the table
- I removed them this morning
This morning:
- dressed cables for MC3, IM1, and the extra PZT cables from the connector that sits to the South of IM1
- IM1 cables:
- secured IM1 UR OSEM cable to the UL OSEM cable with aluminum strip
- then secured all IM1 OSEM cables together with aluminum strip
- then secured all IM1 OSEM cables to the most South MC3 SUS dog clamp
- rotated one cable bracket, to clear a row of 1/4-20 bolt holes, on the most +Y corner of the ISI table