Reports until 16:00, Thursday 02 November 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:00, Thursday 02 November 2017 (39268)
Ops Shift Summary
TITLE: 11/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

Richard reports Cheryl is in LVEA

15:39 UTC Gerardo, Apollo to HAM5 to remove old OFI, install new OFI
15:56 UTC Krishna to end X, BRS upgrade
15:59 UTC Peter to HAM5 to see if Gerardo needs help, if he doesn't then to optics lab
16:59 UTC Jim and TJ to HAM2, install baffles, then TJ to HAM3 and Jim to balance ISI
17:15 UTC Ed to end X to swap out coil drivers
17:20 UTC Hugh taking equipment to Jim in LVEA
17:29 UTC Hugh back
Travis to HAM4
17:50 UTC Betsy to HAM4
18:17 UTC Ed to CER to take picture of labels, then back to end X
18:21 UTC Ed back from CER
19:11 UTC Travis back from HAM4
19:19 UTC Ed back
21:02 UTC Travis, Chandra, Rakesh: x-arm BM, cleaning vacuum tube walls
21:50 UTC Gerardo to HAM5, Peter to optics lab, then HAM5
22:06 UTC Jim and TJ out of HAM2 for remainder of day
22:25 UTC Terry M. to squeezer bay to take inventory of equipment
22:38 UTC Travis, Chandra and Rakesh done