TITLE: 11/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: Richard reports Cheryl is in LVEA 15:39 UTC Gerardo, Apollo to HAM5 to remove old OFI, install new OFI 15:56 UTC Krishna to end X, BRS upgrade 15:59 UTC Peter to HAM5 to see if Gerardo needs help, if he doesn't then to optics lab 16:59 UTC Jim and TJ to HAM2, install baffles, then TJ to HAM3 and Jim to balance ISI 17:15 UTC Ed to end X to swap out coil drivers 17:20 UTC Hugh taking equipment to Jim in LVEA 17:29 UTC Hugh back Travis to HAM4 17:50 UTC Betsy to HAM4 18:17 UTC Ed to CER to take picture of labels, then back to end X 18:21 UTC Ed back from CER 19:11 UTC Travis back from HAM4 19:19 UTC Ed back 21:02 UTC Travis, Chandra, Rakesh: x-arm BM, cleaning vacuum tube walls 21:50 UTC Gerardo to HAM5, Peter to optics lab, then HAM5 22:06 UTC Jim and TJ out of HAM2 for remainder of day 22:25 UTC Terry M. to squeezer bay to take inventory of equipment 22:38 UTC Travis, Chandra and Rakesh done